
Dalrada + ATI of New York · Hot water. Reimagined.
Turn a first question into a project brief.
Review what each tool can help you explore before registering. Enter your company and work email in the project studio; tools open after the contact service confirms your registration.
Produce · Store · Deliver
Your project studio
Choose the question you want to explore
Hot-Water Sizing
Demand, production and the ideal storage balance. V5 thermal engine.
View Hot-Water Sizing in the studio →Compare Scenarios
Keep alternatives side by side without overwriting the original.
View Compare Scenarios in the studio →Operating Costs
Gas, electricity and financing with explicit annual assumptions.
View Operating Costs in the studio →Emissions & LL97
Compare emissions and indicative exposure; no compliance guarantee.
View Emissions & LL97 in the studio →Incentive Explorer
Information and questions to review. No eligibility or award calculation.
View Incentive Explorer in the studio →Installation Readiness
Record the engineering questions that still need an answer.
View Installation Readiness in the studio →Project Report
Keep a local brief of inputs, results and next steps.
View Project Report in the studio →New York project planning
Prepare a New York project with the seven tools
Use the tools to organize a preliminary project discussion. Enter the actual site assumptions for energy tariffs, demand and operating conditions; the website does not supply a verified utility tariff or a building-specific compliance result.
- Consistent US or SI units and temperature assumptions
- Documented electricity and gas prices for the property
- Questions to take to ATI and the project design team
Demand and system options
Hot-Water Sizing provides a preliminary thermal review with the supplied V5 engine. Compare Scenarios keeps alternatives side by side. Define units, water temperatures and demand assumptions before comparing results.
Economics and emissions
Operating Costs uses explicit assumptions for gas, electricity and financing. Emissions & LL97 supports an indicative comparison, not a compliance determination. Incentive Explorer organizes information and questions; it does not establish eligibility or an award.
Prepare the next conversation
Installation Readiness records unresolved engineering questions. Project Report keeps a local brief of inputs, results and next steps. Final selection, hydraulic design, costs and regulatory conclusions require a project-specific review.
Questions before you begin
Why do you ask for company and email?
These contact details are recorded in Roberto’s private project CRM before the tools open. The form explains the intended follow-up and possible later sharing with ATI. The visitor email is not verified.
Are my calculations sent to the CRM?
Tool calculations remain local unless explicitly exported. The contact form does not automatically submit project inputs or results.
Technical reference
Source documents
Editorial review: 2 November 2026. Manufacturer publications are reference material; confirm the equipment edition and project suitability with the project team.

